We demolished the backyard and excavated the area according to plans to fit the specifications of the pool building plans, we created gas line and plumbing as needed for pool equipment, installed pool equipment and plumbing, created framing for pool design, installed pool cement using Shotcrete method. Installed coping to match ground level, installed pebbles around pool, installed pavers all around backyard area, installed pool tile according to plan. Created new sprinkler system for grass, planted new grass. Installed New outdoor shower.